Process FMEA Scope

Control Plans assure a system is in place to control the risks of the same failure modes as identified in the PFMEA. While Control Plans can be developed independently of PFMEAs, it is time and cost-effective to link Control Plans directly to PFMEAs.

The primary intent of Control Plans is to create a structured approach for control of process and product characteristics while focusing the organization on characteristics important to the customer.

A Control Plan deals with the same information explored in a FMEA plus more. The major additions to the FMEA needed to develop a Control Plan are:

Don’t let Control Plans become static.